Falmouth Roofing Services
We've been providing roofing services to Falmouth homeowners and businesses for 19 years. From repairs to full replacements. It's all we do, and we do it right.
Roof Replacement
GAF Timberline HDZ with the full GAF Roof System qualifies your home for the Golden Pledge warranty. That's 25 years on workmanship and 50 years on materials, including algae protection. We install Cobra Snow Country ridge vent with external baffle, FeltBuster synthetic underlayment meeting ASTM D226 Type II equivalent, and Starter Match Pro starter strip. Every component is GAF-approved and inspection-documented.
Get a Free Quote →Roof Repair
We warranty every repair for 5 years. If the same area leaks again due to our workmanship, we come back free. That warranty is in writing and it means something because we're a local Falmouth company. We're not disappearing.
Get a Free Quote →Storm Damage Repair
After a major storm in Falmouth, we mobilize quickly. Emergency tarping within 24 hours to prevent secondary water damage. Then a full damage inspection once conditions allow. We use drone photography on larger commercial roofs to document everything the adjuster needs.
Get a Free Quote →New Roof Installation
We handle new construction from permits through final inspection. Our Falmouth office coordinates with your builder on scheduling, material delivery, and inspection timing. Typical install time is 1-3 days depending on size and complexity.
Get a Free Quote →Metal Roofing
Standing seam metal with Kynar 500 PVDF fluoropolymer finish. The gold standard for color retention and chalk resistance. We install Sheffield Metals and McElroy Metal panels in 24-gauge Galvalume steel. UL 2218 Class 4 impact resistance (qualifies for insurance discounts in most Maine markets). UL 790 Class A fire rating. Wind uplift rated to 140+ mph per ASTM E1592 testing. Concealed Z-clips allow thermal expansion without stress on fasteners. That's what makes standing seam leak-proof.
Get a Free Quote →Shingle Roofing
Shingle color matters more than you think. Dark shingles absorb heat. Great for cold Maine winters, harder on cooling bills in summer. Lighter colors reflect heat. Algae-resistant granules prevent black streaking. We bring shingle samples to your Falmouth home so you can see them against your siding and trim.
Get a Free Quote →Flat Roofing
PVC membrane for Falmouth restaurants, commercial kitchens, and facilities with rooftop grease exhaust or chemical exposure. PVC resists oils and animal fats that destroy TPO and EPDM membranes. We install IB Roof Systems and Duro-Last PVC with factory-fabricated accessories for watertight penetration details. Built-up roofing (BUR) uses 3 or 4 plies of fiberglass felt in hot asphalt with a gravel or cap sheet surface. Oldest proven flat roof system, with 30+ year service life in Maine. We still install BUR when the application calls for it.
Get a Free Quote →Commercial Roofing
Need a commercial roof coating? Silicone coatings over existing TPO, EPDM, or metal extend life 10-15 years for a third of replacement cost. Not every roof qualifies. The existing membrane needs to be in decent shape. We core sample and moisture scan to verify before we recommend it.
Get a Free Quote →Gutter Installation
We hang gutters with hidden hangers screwed into the rafter tails or fascia board every 24 inches max. No spike-and-ferrule, no exposed hardware. Proper pitch is 1/4" per 10 feet toward each downspout. Too flat and water sits. Too steep and it looks wrong.
Get a Free Quote →Roof Inspection
Annual inspections catch small problems early. A cracked pipe boot is a $150 repair. A year of water leaking through that crack causes $3,000+ in ceiling, insulation, and drywall damage. We recommend an inspection every 2-3 years for newer roofs, annually for roofs over 15 years.
Get a Free Quote →Emergency Roof Repair
Emergency protocol for active water intrusion: (1) interior containment. Buckets, plastic sheeting, water extraction if accessible, (2) exterior tarping with 20x30 heavy-duty poly sheeting over damaged area extending minimum 4 feet past damage on all sides, (3) secure with 2x4 nailer boards lag-screwed to the roof deck (not through shingles), (4) secondary tarp overlap for multi-section damage, (5) document with timestamped photos for insurance. Permanent repair scheduled within 48-72 hours once materials are sourced.
Get a Free Quote →Skylight Installation
Skylight installation includes cutting the roof opening, framing a curb with doubled 2x lumber, installing the unit with factory sealant, and weaving the step flashing into the surrounding shingle courses. Interior work includes drywall framing and trim. We handle the full job in Falmouth. Outside and inside.
Get a Free Quote →